Wednesday, December 11, 2013
Day 11 and 12, November 27; December 4
So same case as last time. The reason why I am doing yet another 2 in 1 post is simple. On November 27, my mentor was on vacation and I had a family emergency. So, it was one of those days that everything just happened to occur. December 4th had a lot more happen though, at least in relation anyway. It started with me doing some more place estimates of a dock loading zone. This was done by using a combination of excal and Autodesk review. I got the volumes of various parts of the loading zone and then got how much it would cost with a base unit. And by that I mean that if I had 30 cubic meters of something, and that something cost 5 dollars per cubic meter than you would be paying 150 dollars. After that, I did some AutoCad work where I annotated stuff. Pretty simple day, but I learned more about some programs I use on a regular basis so it was fun. Thanks for reading.