This week had me doing quite a bunch of things. It started
with me doing some research for one of my mentors. A session or two ago, I
spoke of how I had to get dimensions for a loading zone. Well, the people who commissioned
that project wanted to add something called heat tracers. Well, my mentor didn’t
have too much experience with heat tracers, so he asked me to research them. Find
out what they are, how they work, price, different companies that offer them
and all that jazz. Then save anything that I find to a place so that my mentor
can find it easily. Turns out that heat tracers are wires that can be put on
things like gutters, pipes, or in concrete in order to keep them warm so that
any snow that fails on it will naturally melt. And with a loading dock, one
could easily understand the benefit. You put in the stuff when making the zone
and then you never have to worry about snow stopping or slowing down your operation.
After that, I went to a lunch training session were they were talking about
grading. Grading is how steep you make a zone when building it. Basically, certain
things have to be a certain slopes so that it is easily usable but not crazy
expensive. So, you could have 2% grade which would mean that the ground goes up
2 degrees starting at the horizontal. Another example is a 2:1 grade which
means for every one foot horizontally you go up 2 feet vertically. The session
talked a lot about being efficient with your time and grading your site
properly so that you don’t have to go back to your drawings endlessly. The day
ended with doing so more research for another one of my mentors. He is doing a
project in Stormking, NY. There is a boarding school of sorts there and they
have a problem with Ammonia and Phosphorous getting into the wastewater there.
So, my task was to look up things about Ammonia and Phosphorous and how to
prevent it from getting into nature; all sorts of tips and tricks and the like.
Afterwards, like the previous thing, I had to compile my information and send
it to my mentor. That was pretty much the entire day. Have a happy holidays.
Wednesday, December 18, 2013
Wednesday, December 11, 2013
Day 11 and 12, November 27; December 4
So same case as last time. The reason why I am doing yet another 2 in 1 post is simple. On November 27, my mentor was on vacation and I had a family emergency. So, it was one of those days that everything just happened to occur. December 4th had a lot more happen though, at least in relation anyway. It started with me doing some more place estimates of a dock loading zone. This was done by using a combination of excal and Autodesk review. I got the volumes of various parts of the loading zone and then got how much it would cost with a base unit. And by that I mean that if I had 30 cubic meters of something, and that something cost 5 dollars per cubic meter than you would be paying 150 dollars. After that, I did some AutoCad work where I annotated stuff. Pretty simple day, but I learned more about some programs I use on a regular basis so it was fun. Thanks for reading.